What a beautiful day it has been today. The sun has at last shone for a whole day and the roofer was able to really crack on with the slate tiles on the roof of the facilities building. It looks fantastic and the solar panels are also part installed.
Elsewhere site work has been rather slow – it's still very wet underfoot and the guys have held back on footpath construction until it dries up a bit. Most of the cabling is now in and the bollards are all up on the jetties. Isabelle and Anna say the only thing they are missing is a bit of tinsel....
01270 812677
info@overwatermarina.co.uk
OverWater Marina
Coole Lane
Newhall
Nantwich
Cheshire
CW5 8AY